SPECIAL FEATURES
Harsco Rail’s TRT-909 track renewal system provides a more efficient method to handling major track renewal programs. The TRT-909 works with concrete, pre-plated wood, or steel ties. It delivers simplicity in operation for customers and leaves behind high quality track with precise tie spacing and a smooth ballast bed.
FEATURES & BENEFITS
- Works with concrete, pre-plated wood, or steel ties
- Removes and replaces crossties
- Pulls and reclaims spikes
- Removes and collects rail anchors
- Removes the old rail and installs the new rail
- Induction Rail Heaters
- Automatically applies McKay rail fasteners (other types of fasteners can be applied)
- Vacuum System
Spike Pullers
Spike pullers remove the field side spikes and leave the gauge side spike to hold the tie plate in a fixed position. There is one spike puller located over each rail. A magnetic spike pick-up wheel reclaims the spikes after they have been pulled.
Old Tie Equipment
The old crossties are lifted from the roadbed and placed on the conveyor by the Old Tie Pick-Up Mechanism. The old ties are then transported by conveyors to a staging area where a gantry collects them for transport to storage areas on the flatcars.
Roadbed Preparation
Immediately behind the Old Tie Pick-Up Mechanism, a ballast spreader/plow destroys the old tie molds and undercuts the ballast section to prepare the roadbed for the new ties.
New Tie Laying
The new ties are then positioned on the prepared roadbed by the New Tie Laying Mechanism. A tie spacer bar squares up the crossties after they are laid on the track bed. A distance counter wheel controls the spacing of the ties and is adjustable to meet various tie spacing requirements.
Rail Laying/Threading
Using a series of rollers, the old rail is removed and threaded out along side of the track, and the new rail is picked up from the shoulder and laid in gauged position. Thus, the machine simultaneously removes the old rail while laying the new rail.
Gantries
Each self-propelled gantry has one operator. The rear gantries transport ties to and from the front gantry which in turn moves the ties to and from the old and new tie conveyors.
Flat Cars
Standard flat cars are equipped with auxiliary rails which form a continuous running rail for the gantries. The flat cars are stocked with new ties in four or five layers. As new ties are used, old ties are stored on the flat cars.
Induction Rail Heater
The Induction Rail Heater provides accurate and efficient rail distressing capability. The heaters raise the rail temperature to the required neutral temperature.
Contract Services
The first track renewal system was built in 1978 and has since installed approximately 15,000,000 ties (equal to 5,700 miles or 8,500 km). Harsco Rail’s Contract Services provide customers with a high quality service by crews that know the machine’s maintenance and operation best.